65 Ton. CO2 deposits with 1800 Kg/hour atmosphere exchange
vaporizers
|
 |
Nitrogen adding process for Mayonnaise production
|
 |
Nitrogen deposit and distribution lines for all the facility
needs
|
 |
Hydrogen rack deposit and reception
|
 |
Exchange of CO2 tanks at soda customer with zero down time
production
|
 |
Hidrogen 200 Bar manifold with fire detection &blocking
system
|
 |
Redesign Soda Plant CO2 System and P.E.T. on site Blow molding
|
 |
Engineering and Assembly of the German Technology Craft
Brewery Wochinger
|
 |
Engineering & mounting of CO2 & N2 for 200 Ton/Day
Spray Process
|
 |
100 Ton. CO2 deposits with 2500 Lbs./hour dual system
vaporizers
|
 |
First 25 Ton. CO2 Tank Installed on 4th floor of the facility
remotely controlled
|
 |
Waste water treatment with O2 CO2 with high efficiency
oxidation
|
 |
Hydrogen plant storage and recovery in Petroleum
Refinery
|
 |
Reconversion and automation of CO2 installation at Soda
customer
|
 |
Engineering and assembly of blanketing of edilible oil storage
tanks
|
 |
Cooling system with Snow CO2 in dry cakes mix powder
production and packaging
|
 |
Mounting a complete soda plant, CO2 storage tank, NH3 System,
bottle Blow molding
|
 |
Design, Engineering and mounting of Syrup preparation central.
All CO2 pushed up
|
 |
CO2 System in a very aggressive environment of a leather
facility serving CO2 for lime stripping and PH treatmentof industrial
waste water
|
 |
RE Design, engineering, automated and remote control of two
tanks 180 Ton each for a central distribution. Logistic of quality
control under ISO 9000 and 6 SIGMA
|
 |
Development of Nitrogen head space in edilible oil bottling
system
|